相似文献/References:
[1]崔鹏,陈晓清,张建强,等.“4·20”芦山7.0级地震次生山地灾害活动特征与趋势[J].山地学报,2013,(03):257.
CUI Peng,CHEN Xiaoqing,ZHANG Jianqiang,et al.Activities and Tendency of Mountain Hazards Induced by the Ms7.0 Lushan Earthquake,April 20,2013[J].Mountain Research,2013,(02):257.
[2]党超,丁瑜,褚娜娜,等.土石坝漫顶溃决模型[J].山地学报,2012,(02):207.
DANG Chao,DING Yu,CHU Nana.Simulation of Debris Dams Breach due to Overtopping[J].Mountain Research,2012,(02):207.
[3]邓宏艳,孔纪名,王成华,等.不同成因类型堰塞湖的应急处置措施比较[J].山地学报,2011,(04):505.
DENG Hongyan,,et al.The Comparison of Emergency Treatment on Dammed Lakes Caused by Different Types Geologic Hazards[J].Mountain Research,2011,(02):505.
[4]刘淑珍,李辉霞,鄢燕,等.西藏自治区洛扎县冰湖溃决危险度评价[J].山地学报,2003,(S1):128.
[5]范建容,田兵伟,程根伟,等.基于多源遥感数据的5·12汶川地震诱发堰塞体信息提取[J].山地学报,2008,(03):257.
[6]刘惠军,沈军辉,聂德新,等.5·12汶川地震青川县木鱼镇滑坡坝稳定性分析[J].山地学报,2008,(03):263.
[7]陈宁生,第宝锋,李战鲁,等.5·12汶川地震龙门山风景区地震次生山地灾害特征与处理[J].山地学报,2008,(03):272.
[8]崔鹏,韦方强,何思明,等.5·12汶川地震诱发的山地灾害及减灾措施[J].山地学报,2008,(03):280.
[9]陈晓清,李智广,崔鹏,等.5·12汶川地震重灾区水土流失初步估算[J].山地学报,2009,(01):122.
[10]葛永刚,陈兴长,方华,等.汉源县大渡河“8.6”崩塌堵河灾害研究[J].山地学报,2010,(01):123.