[1]邱 俊,任光明,吴龙科,等.金沙江某水电站左坝肩岩体双面倾倒形成机制[J].山地学报,2016,(01):77-83.[doi:10.16089/j.cnki.1008-2786.000103]
QIU Jun,REN Guangming,WU Longke,et al.Double-sided Toppling Formation Mechanism of Rock Mass on the Left Abutment of a Hydropower Station Dam in Jinsha River[J].Mountain Research,2016,(01):77-83.[doi:10.16089/j.cnki.1008-2786.000103]
点击复制
金沙江某水电站左坝肩岩体双面倾倒形成机制()
《山地学报》[ISSN:1008-2186/CN:51-1516]
- 卷:
-
- 期数:
-
2016年01期
- 页码:
-
77-83
- 栏目:
-
山地灾害
- 出版日期:
-
2016-02-01
文章信息/Info
- Title:
-
Double-sided Toppling Formation Mechanism of Rock Mass on the Left Abutment of a Hydropower Station Dam in Jinsha River
- 作者:
-
邱 俊1; 任光明1; 吴龙科1; 陈 超1; 韦振新2; 鲁 博2
-
1.地质灾害防治与地质环境保护国家重点实验室/成都理工大学,四川 成都 610059;
2.中国电建集团西北勘测设计研究院有限公司,陕西 西安,710065
- Author(s):
-
QIU Jun1; REN Guangming1; WU Longke1; CHEN Chao1; WEI Zhenxin2; LU Bo2
-
1 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology,Chengdu Sichuan 610059,China;
2. Power China Xibei Engineering Corporation Ltd.,Xi’an 710065,China
-
- 关键词:
-
层状边坡; 双面倾倒; 变形破坏; 形成机制
- Keywords:
-
stratified slope; double-sided toppling; deformation and failure; formation mechanism
- 分类号:
-
P642
- DOI:
-
10.16089/j.cnki.1008-2786.000103
- 文献标志码:
-
A
- 摘要:
-
倾倒变形是层状边坡的一种主要变形破坏形式,在以往研究中,单面倾倒已研究较多而双面倾倒尚无研究成果。在充分研究金沙江某水电站左坝肩岩体双面倾倒变形特征基础上,对其形成机制进行了地质分析和数值模拟,揭示了双面倾倒岩体主要是在二次应力场作用下岩体沿片理面产生剪切错动、滑移、拉裂从而岩体产生弯曲或折断而形成的。其中顺倾边坡的倾倒变形始于坡脚,并以“滑移-倾倒”式逐渐向坡后发展,其倾倒扩展速率及倾倒深度明显小于反倾边坡;而反倾边坡初始倾倒位置不一定在坡脚,而是始于其最有利倾倒位置,该位置受初始坡形、所受应力及岩性组合等因素控制,并用数值模拟揭示了该水电站边坡初始倾倒位置在距坡脚约1/3坡高处,此后,当岩层倾角足够陡时,在该初始倾倒位置的上部岩层可表现出一定的“滑移-倾倒”性质,而该位置下部岩层则总是表现出“压致型”倾倒特征;无论顺倾还是反倾边坡,倾倒变形速率有从坡体中部附近向两端递减的趋势。
- Abstract:
-
Toppling deformation is a major failure form of stratified slope. In previous studies, single-sided toppling has been deeply studied but there is no research on double-sided toppling. Based on fully study on toppling deformation characteristics of rock mass on the left abutment of a hydropower station dam in Jinsha River in west China, geology analysis and numerical simulation have been carried on formation mechanism of double-sided toppling, disclosing that it’s mainly caused by the secondary state of stress when it leads rock to be bended or broken off by means of dislocating, slipping and fracturing. And the initial toppling position of dip slope is always at the toe,and then develop the way of “slip-toppling”; But the initial toppling position of anti-dip slope is controlled by initial slope form, stress, lithology, etc, and its toppling development rate and depth is greater. Then numerical simulation conducted to announce that the initial toppling position of the hydropower station slope begins at a third height of the slope from the toe. After that, the upper terrane can appear some characteristics of “slip-toppling”, but the lower terrane always appear the characteristics of “pressure to toppling”. However, both the dip and the anti-dip slope have the trend that the toppling deformation rate is diminishing from the middle to the both ends.
参考文献/References:
[1] Goodman R E,Bray J W. Toppling of rock slopes [G]//Rock Engineering:American Society of Civil Engineers,Geotechnical Engineering Division,Conference,Boulder,Colorado,1976,2:201-234
[2] Cruden D M,Hu X Q. Topples on underdip slopes in the Highwood Pass,Alberta,Canada [J]. Quarterly Journal of Engineering Geology,1994,27:57-58
[3] Naresh Kazi Tamrakar, Shuichiro Yokota,Osamu Osaka. A toppled structure with sliding in the Siwalik Hills,midwestern Nepal [J]. Engineering Geology,2002,64(4):339-350
[4] Hsu S C,Nelson P P.Analyses of slopes in jointed weak rock masses using distinct element method[G]//Proceedings of Mechanics of Jointed and Faulted Rock,Vienna, Austria,1995:589-594
[5] D P Adhikary,A V Dyskin,R J Jewell,et al. A study of the mechanism of flexural toppling failure of rock slopes [J]. Rock Mech. Rock Engng. Austria,1997,30(2):75-93
[6] 任光明,聂德新,刘高. 反倾向岩质斜坡变形破坏特征研究 [J]. 岩石力学与工程学报,2003,22(增2):2707-2710[Ren Guangming,Nie Dexin,Liu Gao. Studies on deformation and failure properties of antidip rock mass slope [J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(Suppl.2):2707-2710]
[7] 任光明,夏敏,李果,等. 陡倾顺层岩质斜坡倾倒变形破坏特征研究 [J]. 岩石力学与工程学报,2009,28(增1):3193-3200[Ren Guangming,Xia Min,Li Guo,et al. Study on toppling deformation and failure characteristics of steep bedding rock slope [J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Suppl.1):3193-3200]
[8] 赵小平,李渝生,陈孝兵,等.澜沧江某水电站右坝肩工程边坡倾倒变形问题的数值模拟研究[J].工程地质学报,2008,16(3):298-303[Zhao Xiaoping,Li Yusheng,Chen Xiaobing,et al.Numerical simulation for the problem of project slope toppling deformation on the right of a hydropower station dam abutment in Lan-Cang river [J].Journal of Engineering Geology,2008,16(3):298,303]
[9] 周洪福,聂德新,李树武. 澜沧江某水电工程大型倾倒变形体边坡成因机制 [J]. 水利水电科技进展,2012,32(3):48-52[Zhou Hongfu,Nie Dexin,Li Shuwu. Integrated analysis of formation mechanism for largescale toppling rock mass of a hydropower station on Lancangjiang River [J]. Advances in Science and Technology of Water Resources,2012,32(3):48-52]
[10] 黄润秋. 岩石高边坡发育的动力过程及其稳定性控制[J]. 岩石力学与工程学报,2008,27(8):1525-1544[Huang Runqiu. Geodynamical process and stability control of high rock slope development [J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(8):1525-1544]
[11] 肖树芳,杨淑碧. 岩体力学 [M]. 北京:地质出版社,1987.[Xiao Shufang,Yang Shubi. Rock mass mechanics [M]. Beijing:Geological Publishing House,1987.]
[12] 伍法权. 云母石英片岩斜坡弯曲倾倒变形的理论分析[J].工程地质学报,1997,5(4):306-311[Wu Faquan.Theoretical analysis of bending and toppling deformation in slopes of micaquartz schist[J].Journal of Engineering Geology,1997,5(4):306-311]
[13] 韩贝传,王思敬. 边坡倾倒变形的形成机制与影响因素分析 [J]. 工程地质学报,1999,7(3):213-217[Han Beichuan,Wang Sijing. Mechanism for toppling deformation of slope and analysis of influencing factors on it [J]. Journal of Engineering Geology,1999,7(3):213-217]
[14] 程东幸,刘大安,丁恩宝,等. 层状反倾岩质边坡影响因素及反倾条件分析 [J]. 岩土工程学报,2005,27(11):1362-1366[Cheng Dongxing,Liu Daan,Ding Enbao,et al. Analysis of influential factors and toppling conditions of toppling rock slope [J]. Chinese Journal of Geotechnical Engineering,2005,27(11):1362-1366]
[15] 王立伟,谢谟文,尹彦礼,等. 反倾层状岩质边坡倾倒变形影响因素分析 [J]. 人民黄河,2014,36(4):132-134[Wang Liwei,Xie Mowen,Yin Yanli,et al. Analysis on dumping deform influent factors of reverse dumping rock slope [J]. Yellow River,2014,36(4):132-134]
备注/Memo
- 备注/Memo:
-
收稿日期(Received date):2015-07-27。
基金项目(Foundation item):国家自然科学基金项目(41072229)。[Supported by National Nature Science Foundation of China (NO:41072229).]
作者简介(Biography):邱俊(1989-),男,在读硕士研究生,工程地质专业。[Qiu Jun,master degree candidate,major in engineering geology.] E-mail:671136114@qq.com
更新日期/Last Update:
1900-01-01