[1]曾锦秀,胡卸文,罗刚,等.高填方填筑层数对填筑体沉降影响的数值模拟[J].山地学报,2012,(04):491.
ZENG Jinxiu,HU Xiewen,LUO Gang,et al.Numerical Simulation of Influence of High Fill Filling Layer Number on Settlement of Filling Body[J].Mountain Research,2012,(04):491.
点击复制
高填方填筑层数对填筑体沉降影响的数值模拟()
《山地学报》[ISSN:1008-2186/CN:51-1516]
- 卷:
-
- 期数:
-
2012年04期
- 页码:
-
491
- 栏目:
-
山地学报
- 出版日期:
-
2012-01-01
文章信息/Info
- Title:
-
Numerical Simulation of Influence of High Fill Filling Layer Number on Settlement of Filling Body
- 作者:
-
曾锦秀;胡卸文;罗刚;顾成壮;张耀;
-
1.西南交通大学 地球科学与环境工程学院,四川 成都 610031;
2. 西南交通大学 抗震工程技术四川省重点实验室,四川 成都 610031
- Author(s):
-
ZENG Jinxiu; HU Xiewen; LUO Gang; GU Chengzhuang; ZHANG Yao
-
1. Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University, Chengdu 610031, China;
2. Aseismic Engineering Technology Key Laboratory of Sichuan Province, Southwest Jiaotong University, Chengdu 610031, China
-
- 关键词:
-
高填方边坡; 分层填筑; 沉降量; 数值模拟
- Keywords:
-
high filled slope; layered filling; settlement; numerical simulation
- 分类号:
-
P642,TU43
- 文献标志码:
-
A
- 摘要:
-
以贵州六盘水月照机场东北端边坡为例,采用FLAC3D软件对不同填筑层数下机场高边坡填筑竣工期填筑体沉降进行了模拟,系统分析填筑层数对平均填筑高度达63 m的高填方边坡沉降的影响。结果表明,当模拟层数
- Abstract:
-
Taking the shuiyuezhao airport on the northeast liupanshui slope for example. The aim of this paper is using the software of FLAC3D to simulate the settlement of the filling body of high filled slope of airport during the completion period under different filling layer numbers to analysis the influence of simulated filling layer number on settlement of high slope filling body systematically, and the filling height of which is up to 63 m. The results show that the biggest settlements fluctuate up and down with the increase of simulated filling layer number, and Contour of z-displacement presents discontinuity between layers when the numbers of simulated filling layer less than equal to 7, and the biggest settlements tends to a stable value and do small fluctuations around it when the simulated filling layer number continue to increase; also contour of z-displacement tends smooth and continuous gradually. The biggest settlements tend to a stable value when the numbers of simulated filling layer more than equal to 7, which’s calculation precision of the settlement satisfies the project need. For the high filled slope which’s average height is 63m, 7~9 simulated filling layer number was best recommended.
备注/Memo
- 备注/Memo:
-
收稿日期(Received date):2011-12-14;改回日期(Accepted) : 2012-05-03。
基金项目(Foundation item):国家自然科学基金资助项目(40972175),NSFC–云南联合基金重点项目(U1033601)和中央高校基本科研业务费专项资金(SWJTU11ZT14)资助。\[Supported by National Natural Science foundation of China (40972175);the National Natural Science Foundation Projectmutual fund of Yunnan Province (U1033601) and Fundamental Research Funds for the Central Universities (SWJTU11ZT14).\]
作者简介(Biography):曾锦秀(1986-),男,福建福州人,在读硕士研究生,主要从事工程地质、环境地质方面的研究工作。\[Zeng Jinxiu(1986-),male, enrolled postgraduate, mainly engaged in the researching work of engineering geology, environmental geology.\] E-mail:zengjinxiu20075084@163.com
更新日期/Last Update:
1900-01-01