参考文献/References:
[1] Cui Peng,Wei Fangqiang,Chen Xiaoqing,et al. Geohazards in Wenchuan earthquake area and countermeasures for disaster reduction[J]. Bulletin of Chinese Academy of Sciences,2008,23(4): 317-323[崔鹏,韦方强,陈晓清,等. 汶川地震次生山地灾害及其减灾对策[J]. 中国科学院院刊,2008,23(4):317-323]
[2] Cui Peng,Chen Xiaoqing,Zhu Yingyan,et al. The Wenchuan Earthquake (12 May 2008),Sichuan Province,China,and Resulting Geohazards[J]. Nature Hazards,2011,56: 19-36
[3] Chen Xiaoqing,Cui Peng,Zhao Wanyu. Optimal Timing for the Control of Debris Flow in Wenchuan Earthquake Area[J]. Journal of Sichuan University:Engineering Science Edition,2009,41(3): 125-130[陈晓清,崔鹏,赵万玉. 汶川地震区泥石流灾害工程防治时机的研究[J]. 四川大学学报:工程科学版,2009,41(3): 125-130]
[4] Compile team of The Special Planning for Prevention and Control of Geological Disasters in Post-Earthquake Restoration and Reconstruction. The planning report of special planning for prevention and control of geological disasters in postearthquake restoration and reconstruction of Sichuan Province(2008—2011)[R].2008.[四川省“5·12”特大地震灾后恢复重建地质灾害防治专项规划编写组. 四川省“5·12”特大地震灾后恢复重建地质灾害防治专项规划(2008—2011年)[R].2008.]
[5] Yang Dongxu. Key technologies of treatment for debris flow in narrowsteep gullies in Wenchuan Earthquake Areas:a case study for Xiaogangjian debris flow in Mianzhu County[D].Beijing:University of Chinese Academy of Sciences,2013.[杨东旭. 汶川地震区狭陡型泥石流工程治理关键技术研究——以绵竹市小岗剑泥石流治理工程为例[D].北京:中国科学院大学,2013.]
[6] Editorial Committee Office of “Bridge History”. Colonnade foundation[J]. Bridge Construction,1985,(4): 70-79 [《桥史》编委会办公室.管柱基础[J].桥梁建设,1985,(4):70-79]
[7] Zhang Jianxin. Application of anchoring tubular column foundation in wharf engineering[J]. Port & Waterway Engineering,2004,(12):39-40,75[张建新.锚岩管柱基础在码头工程中的应用[J].水运工程,2004,(12):39-40,75]
[8] Translated by Major Bridge Engineering Co. of China Ministry of Railways. Colonnade Foundation[M]. Shanghai: Science and Technology Health Press,1959.[H.M.戈洛铎夫,K.C.西林等著,铁道部大桥工程局译.管柱基础[M].上海:科技卫生出版社,1959.]
[9] Xu Zengtian. Investigation report of drilling colonnade foundation [J]. Port Engineering,1983,(3):57-61 [许增田. 钻孔管柱基础调查报告[J]. 港口工程,1983,(3):57-61]
[10] Cai Changgen. Application of prestressing tubular pile in constructional engineering[J]. Guangdong Civil Engineering & Construction,1998,(04):2-11 [蔡长庚. 预应力管桩在建筑工程中的应用 [J]. 广东土木与建筑,1998,(04):2-11]
[11] Shi Shengwei,Liang Jiong. Study on mini antislide piles based on soil arch effect[G]//The 9th National Engineering Geological Congress,Qingdao,2012,10[石胜伟,梁炯. 基于土拱效应微型组合抗滑桩距径比的研究[G]//第九届全国地质工程大会论文集. 青岛: 2012,10]
[12] You Yong and Chen Xiaoqing(Eds.). Feasibility study report of Xiaogangjian debrisflow mitigation in Mianzhu County[R]. Chengdu:Institute of Mountain Hazards and Environment,CAS,2011.[游勇,陈晓清主编. 绵茂路汉清段小岗剑泥石流应急治理工程可行性研究报告[R]. 成都:中国科学院水利部成都山地灾害与环境研究所, 2011.]
[13] Yang Dongxu,Chen Xiaoqing,You Yong,et al. The debris flow development trend of in Xiaogangjian Gully in Mianzhu County,Wenchuan Earthquake Zone[J].Mountain Research,2012,30(6): 701-708 [杨东旭,陈晓清,游勇,等. 汶川地震区绵竹小岗剑泥石流发展趋势[J]. 山地学报,2012,30(6): 701-708]
[14] China Ministry of Construction. JGJ94-2008. Technical Code for Building Pile Foundations[S].Beijing: China Architecture and Building Press,2008. [中华人民共和国建设部.JGJ94-2008.建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.]
相似文献/References:
[1]谢湘平,韦方强,谢涛,等.山洪中漂木在拦砂坝前堵塞堆积实验[J].山地学报,2014,(02):249.
XIE Xiangping,WEI Fangqiang,XIE Tao,et al.Experiment on the Clogging and Deposition of Woody Debris Flowing with Torrents in Front of Debris Dams[J].Mountain Research,2014,(01):249.